Skip to content

Windee

The software we run our own service on.

Crew planning, certificates, checklists and service reports for wind turbines, in one place. WindReserve plans its own work with it every day and distributes Windee in Germany.

One fault, from alarm to report.

An ordinary Tuesday in Windee. The turbine, crew and times are an example.

  1. The turbine reports a fault

    Live data shows gearbox oil running hot on WTG 07. Windee opens the guide for that error code before anyone picks up the phone.

    Live data

    WTG 07 Vestas V52, 850 kW

    Fault

    Gearbox oil

    78 °C

    Error 2311

    Gearbox oil temperature high

    Guide opened: 4 checks, oil cooler fan first

  2. The technician asks WindeeAI

    In plain words, from a phone. WindeeAI answers from your own manuals, error-code lists and work instructions, and shows which document each answer comes from.

    WindeeAI

    What is behind error 2311 on a V52, and what do we check first?

    Usually the oil cooler: a stuck fan or a clogged filter. Check the cooler fan and its fuse first, then the filter and the oil level. If the oil looks dark, take a sample before topping up.

    • V52 service manual, 6.4 Gearbox cooling
    • Error code list, 2311
  3. The weekly plan finds the crew

    Windee knows who is on leave, whose certificates are valid, which base is closest and which van is free. It proposes two technicians for Tuesday, checks working hours and travel time, and sends the plan to the team.

    Weekly plan, week 47

    MonTueWedThuFri
    QVWTG 12WTG 07WTG 12Base
    XRWTG 07WTG 03WTG 03
    YZOn leave
    ZKG41 medical expired

    Van 3 from base North. 38 minutes' drive, working hours within limits.

  4. The right checklist is already on the phone

    The manufacturer's checklist for exactly this turbine type, with photos taken in the nacelle. It works without signal and syncs on the way down.

    Checklist, Vestas V52 annual service

    18 of 24 checks done

    • Gearbox oil: level and colour
    • Oil cooler: fan and filter
    • Yaw brake pads

    3 photos saved offline

  5. The report files itself

    Signed by both technicians, saved as a PDF, shared in the wind farm's room. The next service date is set again automatically.

    Service report

    Service report WTG 07 Signed by Q. Vossberg and X. Rautenbach

    • Shared in the Wind farm North room
    • Fault cleared, turbine running
    • Next service set for 14 May 2027

Is it a fit?

This page should tell you in two minutes. If it does not, a conversation will.

Windee fits if you

  • send technicians up wind turbines, on your own sites or a client's
  • plan maintenance across many wind farms and turbine types
  • assign crews, vans and leave across several bases, week by week
  • need proof that everyone on site holds valid qualifications
  • still collect service reports on paper, in chat or in spreadsheets

Probably not, if you

  • only need a dashboard for turbine data
  • run a single wind farm without a service team of your own

Built for service companies, operators and the staffing partners who crew them.

Built in the wind farm, not in a lab.

The people selling you Windee use it themselves. WindReserve plans, checks and documents its own service in Windee, and these figures come from that system.

turbines in service
over 140
wind farms
around 25
service reports on file
over 1,600
people on the team
46

Manufacturer checklists for Vestas, GE, AN Bonus, NEG Micon, Wind World, Jacobs and Südwind turbines.

See your own week in Windee.

Tell us briefly how your crews work. We will reply and agree a date with you, on a video call or at your site.